The crushed stone from demolition works is being recycled to provide hard access roads to work sites. Should prevent Land Rovers being stuck in mud as happened last year. The stripped red and white poles highlight low over head cables for the machine operators.
Visual descriptions of the area around Wylfa, Anglesey, soon to be the site of Wylfa Newydd. What does this area look like now? Watch the changes as they happened. How will this area be changed by the new construction works? Will I still be in the area to see it all happen? The answer is now, no. House sold on 27th January 2016. How might this blog be continued? If you start a new one on Wylfa WalkerNewydd? please let me know and link to this one.
Showing posts with label machinery. Show all posts
Showing posts with label machinery. Show all posts
Tuesday, 21 January 2014
Friday, 10 January 2014
Sorting Rocks
Rocks, bricks and dirt are being separated through giant mobile screening machines. This is all the material brought to a central storage area during the demolition of all the buildings which took place on land of the proposed new power station.
Tuesday, 5 November 2013
Sunday, 3 November 2013
New Drilling Programme
Mobilisation of drilling rig for geophysical survey. Three shots of the same rig on a wet and windy Sunday morning, following gales over night of about 80mpg.
The roadworks sign was to deploy the storage point for liquid.
The roadworks sign was to deploy the storage point for liquid.
Tuesday, 29 October 2013
Subscribe to:
Posts (Atom)











