Saturday, 23 January 2016

Temporary Road for Electric Cable Laying

A short section of a temporary road is being constructed to be able to lay the electric cables being placed underground. This section is at Tregele and is required because of the size of cables required here. The larger cabled required here can not be placed in the narrow trench being cut for the other sections.



No comments:

Post a Comment

Your comments on this area of Anglesey are welcomed.