Saturday, 23 January 2016

Temporary Road for Electric Cable Laying

A short section of a temporary road is being constructed to be able to lay the electric cables being placed underground. This section is at Tregele and is required because of the size of cables required here. The larger cabled required here can not be placed in the narrow trench being cut for the other sections.



Monday, 18 January 2016

Trenching opposite Tregele

Didn't see an archaeological trench opened up along this line, so assuming this work is part of the ongoing movement of electrical cables.





Sunday, 17 January 2016

Sunday, 10 January 2016

High Tides

With high tides sea water flows back into the lagoon behind the shingle bank at Cemlyn.




Saturday, 9 January 2016

Wednesday, 6 January 2016

Sheep Back on Wylfa