Showing posts with label access roads. Show all posts
Showing posts with label access roads. Show all posts

Friday, 2 January 2015

More Crushed Debris added to Access Raods

Still quiet on the lorry, drilling, digger front, only two vehicles adding more crushed debris from demolished buildings to the improvised trackways around the survey site in the countryside.


Saturday, 29 March 2014

Coastal Footpath Through the Survey Area Around Wylfa

The full length of the coastal footpath that passes through the survey area at Wylfa has now been fenced and surfaced to keep their vehicles and drilling rigs away from users of the footpaths.


Paperwork for the short diversion posted at a short section where the path has diverted from its true line.






Friday, 21 February 2014

Roadworks Almost Complete

The new access roadways with their stone surface are nearly completed. Drilling rigs arrive soon for more survey works.